Antoni Gerges
From the show film · AntBrush · April 2017

Cityscape Abu Dhabi

Abu Dhabi’s municipal pavilion. I built it around one line.Antoni Gerges, Creative Director, Brand & Experiential · AntBrush

The project

Four public bodies and fourteen projects had to share one floor. I gave it one line, and a ceiling of light.

18 to 20 April 2017Abu Dhabi National Exhibition Centre, Hall 8
Read more
The project

The pavilion of Abu Dhabi’s municipal government at Cityscape Abu Dhabi, the capital’s property show: the Department of Municipal Affairs and Transport with the municipalities of Abu Dhabi City, Al Ain City and Al Dhafra Region. Hall 8, three days, 18 to 20 April 2017.

The concept, the exhibition design, the build and its management were mine, through AntBrush. Built with Divine Creations, Dubai.

The idea

The brief was a list: fourteen projects to show, with their models and screens, a majlis and two meeting rooms. Community markets, boat landings, a platform for building permits.

I answered with one line. A maroon carpet runs from the open corner to a tower. Two wings turn around it. Over it hangs a ceiling of spheres that rise, fall and change colour.

The fourteen projects

Seven community markets: Al Raha Gardens, Shakhbout City, Mohammed bin Zayed City, Yas Island, Al Shamkha City, Al Wathba City and Bani Yas. Souq Al Zaafarana; the central market of Madinat Zayed; the local market of Ghayathi; boat and jet ski landings at Al Bahya and Al Sadr; and two systems for building permits.

They were the client’s projects, shown as models and on screens.

Drawn, then chosen

26 March 2017: two options. One was a red block on two floors. The other had the two wings and the tower.

28 March 2017: the final design. The line arrives, and the stand turns white and maroon. 11 April: the builder’s drawings. 14 April, 2 pm: the hall opens to us. 18 April: the doors open.

The 3D model

The model on this page was made for this portfolio. Its floor is the builder’s own plan, line for line. Its heights are the contract’s. Its upper floor follows the stand as built.

The films and photographs of the build are my own, taken on my phone. Every picture on this page is shown whole.

01 · The idea · a plan, two wings, fourteen projects, a ceiling 3D model · made for this portfolio
01 · The idea

One line
across the floor.

The stand, built again from its own plan. Walk in.

01 / 05

The plan

Fourteen projects on one floor. One line crosses it, from the open corner to a tower.

Floor7,200 sq ft
02 / 05

The walls

Two wings, two storeys high, turn around the line. The tower stands where it ends.

03 / 05

The projects

One base, built as the builder drew it: the stand’s rosette on its sides, its project’s name on the front. Then every base takes its place.

Projects14
04 / 05

The ceiling

Over the line, a ceiling of spheres. Each one rises, falls and changes colour.

05 / 05

Inside

Walk the line under the light, to the models at its end.

Built · April 2017The show film · AntBrush
Built · April 2017The show film · AntBrush
02 · The design · our presentations of 26 and 28 March 2017

Two answers, then one line.

26 March: a red block on two floors. 28 March: the line from the open corner to the tower, and the stand that was built. The ceiling of spheres was in every option; on the 28th it moved over the line.

Design option of 26 March 2017: a red block on two floors in the middle of the floor
A red blockDesign option · 26 March 2017
The same option seen from above
From aboveDesign option · 26 March 2017
Design render of 28 March 2017: the maroon carpet runs to the tower under the ceiling of spheres
The lineFrom the open corner to the tower · design render · 28 March 2017
Design render of 28 March 2017: the plan from above, the line across it
From aboveThe line is drawn · 28 March
Design render of 28 March 2017: two wings, a tower and a ceiling of spheres
The standTwo wings, a tower, the ceiling · 28 March
Design render: the whole floor from high up
The floorEvery project in its place · 28 March
Design render: the stand seen from behind its corner
The cornerThe wings are rooms, open to the hall
Design render: the meeting room inside one wing
Inside a wingThe meeting room · 28 March
The stand builder’s plan of the stand on a one-metre grid, 11 April 2017
Then the builder’s planDrawn by Divine Creations, the stand builder · 11 April 2017
03 · The build · my own photographs and films, Hall 8

Built in three days.

In the hall at 2 pm on 14 April. Ready on the 17th. Open on the 18th.

The truss with the spheres hung on it, before it was lifted
The spheresOn the truss, before it was lifted · my own photograph · 15 April 2017
A wing half built, with the spheres lit above it
Half builtThe wing still open, the spheres already lit · my own photograph · 15 April 2017
Switched onThe ceiling runs over a stand still being built · my own film · 15 April 2017
The waveThe same night, from across the floor · my own film · 15 April 2017

The result.

04 · In the records
3 daysto build it in the hall: in on 14 April, due on the 17th

Source: the organiser’s access letter, 12 April 2017, and the purchase order for the build.

More figures
7,200sq ft of floor
14projects on one stand
4public bodies, one pavilion
3show days

Sources: the stand builder’s contract of 6 April 2017; the list of project names, 15 April 2017; the four invoices of 18 April 2017.

RoleAntoni Gerges
Creative Director, Brand & Experiential
Made byAntBrush: concept, exhibition design, build and management.
CreditsFor the Department of Municipal Affairs and Transport, Abu Dhabi.
Built with Divine Creations, Dubai.
The showCityscape Abu Dhabi is organised by Informa.